How should the Overband Magnet iron remover meet safety technical requirements during installation

Iron remover manufacturers: There are many problems that need to be paid attention to when lifting large equipment such as Overband Magnet iron removers. Once accidentally, it is easy to cause safety accidents. Then, when hoisting Overband Magnet remover, how to operate to meet the safety technical requirements ? Take a look together:

1. The hoisting construction process of the Overband Magnet iron remover must be carried out strictly in accordance with the construction procedures and installation technical requirements of the equipment.
2. When the Overband Magnet iron remover is transported to the machine head installation position, the coal bunker must be reliably and strictly blocked in advance.
3. Before installing the Overband Magnet iron remover, be sure to contact the belt driver in advance, and lock the main belt, and arrange for someone to guard against the machine head to prevent the belt conveyor from starting suddenly during the construction process.
4. After the Overband Magnet iron remover is transported to the installation site, the lifting point must be selected to ensure the safety of the lifting process. When lifting, the operation should be strictly in accordance with the relevant provisions in the “Safety Operation Regulations for Lifting and Transportation”.
5. When lifting the equipment, a person must be responsible. Before lifting, the lifting tools must be carefully and carefully checked. The rope used for lifting shall ensure that there is no damage, corrosion, breakage and other phenomena, and the safety factor of the steel wire rope used for lifting shall not be less than 6. The objects should be firmly tied, and when circumventing the objects with edges and burrs, wooden boards and the like should be padd. When using U-shaped rope card wire rope sleeves, there should be no less than two U-shaped rope clips.
6. The belt iron remover is not allowed to cross operation during the construction process after lifting.
7. Be sure to use safety ropes, safety belts and other safety protective equipment when working at heights.
8. When lifting the Overband Magnet iron remover, the lifting equipment should be reasonably selected according to the weight marked on the nameplate of the iron remover and the safety factor of the relevant lifting equipment, and overload lifting is not allowed.